Tanzania Transport Railway Authority Discusses Improvement Plans

The railway authority for the Tanzania transport sector, the Tanzania Zambia Railway Authority (Tazara), has recently begun work on an ambitious program that was designed to help increase its overall capacity to take advantage of the haulage potential that is offered by the freight cargo entering the country with final destinations being the DRC, Rwanda Burundi and Zambia.

According to a recent report by the Citizen, Tazara announced its intention to work closely with both the Tanzania Ports Authority and Ticts in order to eventually become a primary source of transportation for freights landing at the Dar es Salaam Port who are looking to haul the goods to the landlocked countries.

The Citizen has reported the statements of the Tazara deputy managing director, Damas Ndumbaro, who spoke during a recent press conference that was called in order to commemorate 33 years of service by the country’s railway authority, which was officially opened on July 1, 1976.

“When Tazara took off, it had a total of 100 locomotives, but currently there are only 22 locomotives,” he said, “We intend to boost our capacity by repairing the defective ones.”

Mr. Ndumbaro went on to explain that the strategic plan for this authority involved the revitalization of six locomotives that were currently out of order, the cost of which would be at least USD 4.8 million.
 
“The move,” he said, “is in line with the Government’s efforts to reduce congestion at the port.”

Currently, the majority of goods are being transported from the port to inland destinations is being handled by trucks, which are responsible for the transportation of more than 93 percent of the cargo, with the remaining 7 percent being handled by railway services as a single train has the haulage capacity equivalent of 60 truck loads.

In addition, Mr. Ndumbaro indicated that the management for the authority has successfully reduced the overall required transit time to four days, while, at the same reducing the overall time it takes for a train complete a circuit from Dar to Capri Point, known as the turn-around time, from 20 days to 14 days.

“Presently, we do not depend on any of the two governments for subsidy to run the network,” said Mr. Ndumbaro, “We now spend own funds.”
As of the most recent reports, Tazara currently accumulates an average of USD 3 million per month, thus providing an adequate amount of funding in order to pay worker’s salaries and to fund current and future Tazara development programs.

Want to know more about Transport in Tanzania? Our free overview of the Tanzania Business and Investment Guide 2026 covers Transport, plus regulations, key sectors, and investment opportunities. The complete 141-page edition is also available for USD 99.

Download Free OverviewGet the Full Guide — USD 99
Related Posts
Tanzania Dodoma Msalato International Airport Inspection Khamis Omar
Read More

Dodoma Msalato International Airport Set to Begin Operations in September 2026

Msalato International Airport in Dodoma is scheduled to begin operations in September 2026 as construction advances toward completion. The airport will have the capacity to handle 1.5 million passengers annually and is expected to strengthen domestic and international air connectivity while supporting investment and economic activity in Tanzania's capital.
Tanzania Transport Budget Bunge Parliament Makame Mbarawa
Read More

Tanzania Transport Budget 2026/2027 of TZS 2.87 Trillion Positions Tanzania as a Regional Logistics Hub, with TZS 1.51 Trillion for SGR

Tanzania's TZS 2.87 trillion Transport Budget 2026/27 directs 95.62% to development across rail, aviation, ports, and maritime infrastructure to position the country as the regional logistics hub of Eastern, Central, and Southern Africa. The Standard Gauge Railway (SGR) alone receives TZS 1.51 trillion in domestic financing plus TZS 61.84 billion from the OPEC Fund, equivalent to 55% of the entire development envelope.
Tanzania ASSESSMENT OF ECONOMIC IMPACTS ON TANZANIA ARISING FROM THE GULF CRISIS
Read More

Tanzania Gulf Crisis Report Rates Energy, Food, Transport, Tourism and Budget at High Risk

A May 2026 rapid assessment by Tanzania's National Planning Commission and UNDP rates energy, food, transport, tourism and the Government budget at high risk from the Gulf crisis, which raised Dar es Salaam fuel prices by up to 69% between January and May 2026. The report flags a possible TZS 153.7 billion monthly customs revenue shortfall and fuel subsidy needs rising to TZS 1,384.2 billion by July, alongside buffers including a 124% food self-sufficiency ratio, USD 6.3 billion in reserves and 57 trillion cubic feet of gas.
Tanzania Kenya Rwanda
Read More

Tanzania Hosts Rwanda and Kenya Presidents, Signs MoUs on Tanga-Taveta SGR, Dar-Mombasa Gas Pipeline, and Scraps Non-Tariff Barriers

Tanzania hosted Rwandan President Paul Kagame on 3 May 2026 and Kenyan President William Ruto on 4-5 May 2026, signing eight MoUs with Kenya covering railways and a Dar es Salaam-Mombasa gas pipeline study, and agreeing to eliminate all non-tariff barriers by May 2026. Bilateral trade with Rwanda reached TZS 644 billion in 2025, while Tanzania-Kenya trade stood at over USD 720 million in 2024.