New Factory In Mtwara To Reduce Cost Of Cement In Tanzania

Dangote Cement, based in Nigeria, is building a 1.5 million tons per annum integrated cement plant valued at USD 500 million in Mtwara, Tanzania.

The plant is expected to double the production capacity of cement in Tanzania and thereby reduce the cost of cement in Tanzania and the region.

Mtwara was selected as a new site due of Tanzania’s richness in limestone and gypsum deposits and the fact Tanzania attracts sound investment opportunities in the sector.

Tanzania Investment Guide 2026 Free Edition

As stated by Aliko Dangote, Chairman of Dangote Group, “Our investment in this sector, which is outside the traditional mining sector, is to take advantage of the abundance of limestone in the country and work towards making Tanzania self-sufficient in cement production.”

Presently, Tanzania has an estimated production capacity of 3 million metric tonnes per annum against a demand of 2.2 million tonnes per annum.

The improving performance of the economy has fueled strong growth in cement demand and the prospects remain favourable, given the linear relationship between economic growth and cement consumption. 

However the current differential between demand and production capacity, coupled with the high cost of energy and imported clinker, makes the average cost of cement per tonne in Tanzania between USD $90 and USD $105.

Similarly, a 50-kilogram bag of imported cement retails at USD 7.8 while locally produced brands sell at between USD 8 and USD 9.3.

TanzaniaInvest Capital Markets Report Banner

“The plant, once it starts production, should help reduce the cost of cement in Tanzania and the region,” said Devakumar Edwin, Dangote Group’s Executive Director in charge of business development.

Dangote Cement produced around 10 million metric tons of cement in 2012 (with revenues of USD 1.8 billion), and is investing more than USD 2.5 billion to build more than 18 million tonnes of production and import capacity across thirteen African countries beyond Nigeria.

Want to know more about Construction in Tanzania? Our free overview of the Tanzania Business and Investment Guide 2026 covers Construction, plus key sectors and investment opportunities. The complete 141-page edition includes policies, taxation, key regulations, full macroeconomic data, and sources, and is also available at no cost upon completion of a short form.

Download Free OverviewGet the Full Edition for Free
Related Posts
Tanzania e-Ardhi digital land system titles
Read More

e-Ardhi System Lets Tanzanians Sign Land Titles From Any Region

Tanzania's digital e-Ardhi system now allows citizens to access land services and sign their title deeds from any region, without travelling to the region where the service originated. The platform, run by the Ministry of Lands, covers planning, surveying, allocation, registration and valuation and is already in use in Dodoma, Arusha, Tanga, Mbeya and Mwanza.
Tanzania land survey developed areas
Read More

Tanzania Cuts Land Survey Fee to TZS 130,000 per Plot

Tanzania has cut the cost of planning and surveying a single plot in developed areas to TZS 130,000 under the 2021 Regularization Guideline, down from between TZS 250,000 and TZS 400,000. The reduction extends a decade-long trend of lowering fees to encourage urban landholders to formalize property titles.
Tanzania Abdallah Ulega Parliament bunge
Read More

Tanzania Works Budget 2026/27: USD 949 Million for Infrastructure, PPPs and Bonds Open to Investors

Tanzania’s Ministry of Works proposes a TZS 2,467.3 billion (approximately USD 949 million) development budget for the fiscal year 2026/27, tabled in Parliament on 20 May 2026 by Minister Abdallah Ulega, covering roads, bridges, airports, ferries, and government buildings, with 37% from external financiers. The budget opens a PPP pipeline across roads, real estate, and transport infrastructure, and introduces infrastructure bonds on strategic economic corridors as financing instruments available to private investors.