Petra Diamonds Extends Williamson Mine Life In Tanzania Up To 2033

petra-diamond-tanzania

Petra Diamonds (Petra, LSE: PDL), a South African leading independent diamond mining group, plans to raise the total tonnage treated at Williamson mine in Shinyanga province in Tanzania’s northern region.

Petra expects to raise the tonnage throughput ramp to 5 million tonnes per annum from the fiscal year (FY) 2017 to FY 2019 and extend the life of mine (LOM) up to the year 2033.

Williamson mine, with diamond resources estimated in 38.1 million carats (Mcts), is meant to deliver 350,000 carats per annum (ctpa) during the three year period at a grade of approximately 7.0 carats per hundred tonne (cpht).

Tanzania Investment Guide 2026 Free Edition

Petra’s expansion plan is being funded by a USD 300 million notes issuance and a USD 40 million loan awarded by the International Finance Corporation (IFC).

According to Petra’s CEO Johan Dippenaar, the strengthening of Petra’s balance sheet with inflow from both obligations, helped the company to increase its tonnage throughput for the FY 2015 even though the period was challenging due to the global crisis in commodities market in the period.

According to the last Petra’s preliminary financial disclosure, final tonnes treated grew by 19% to 4,056,638 tonnes in FY 2015.

Run of mine (ROM) production grew by 9% to 194,048 carats and final production did so by 7% to reach 202,265 carats.

These results increased the company’s results from USD 53.9 million in 2014 to USD 62.1million in 2015 even though the price per carat fell from USD 303 to USD 298 in the same period.

Tanzania Investment Guide 2026 Full Edition

According to Petra, Williamson mine has a potential LOM over the 50 years with the current expansion plan.

The mine is renowned for beautifully rounded white goods and ‘bubblegum’ pink diamonds.

Want to know more about Mining in Tanzania? Our free overview of the Tanzania Business and Investment Guide 2026 covers Mining, plus key sectors and investment opportunities. The complete 141-page edition includes policies, taxation, key regulations, full macroeconomic data, and sources.

Download Free OverviewGet the Full Guide
Related Posts
Tanzania Mineral Testing Laboratory Dodoma 3d plan
Read More

Dodoma Mineral Testing Laboratory on Track for September 2027 Completion

The Geological Survey of Tanzania (GST) says construction of its Dodoma mineral testing laboratory in Kizota, Dodoma, is progressing on schedule, with completion set for September 2027, a year after Minister for Minerals Anthony Mavunde laid the foundation stone in August 2025. The TZS 14.3 billion (approx. USD 5.4 million) facility is expected to become the largest of its kind in East and Central Africa, offering internationally accredited testing services and easing long-standing sample-analysis delays for artisanal and small-scale miners.
IMF Tanzania flag
Read More

IMF Approves USD 443.9 Million for Tanzania, Projects 6.2% GDP Growth Supported by Mining, Agriculture, and Tourism

The IMF Executive Board has approved an immediate disbursement of USD 443.9 million to Tanzania after completing the final reviews under the Extended Credit Facility and Resilience and Sustainability Facility programmes. The IMF said Tanzania maintained strong economic growth and macroeconomic stability while highlighting the need for continued reforms and fiscal consolidation.
Tanzania Grinding-Ball
Read More

Chinese Company to Build Grinding-Ball Factory at Buzwagi SEZ

China's Oriental Casting and Forging Ltd plans to establish a factory for steel grinding balls and other mining consumables at the Buzwagi Special Economic Zone in Kahama, Shinyanga, following a meeting between Minister of Minerals Anthony Mavunde and the company's managing director Hou Songcun. The project is part of Tanzania's push to manufacture mining consumables locally, cut import dependence and position itself as a regional supply hub, though no investment value or job figures have been disclosed.
Tanzania Mining Revenues 2025-2026
Read More

Tanzania Mining Revenue Hits TZS 1.39 Trillion in 2025/26, Beating Target by 16%

Tanzania mining revenue reached TZS 1.394 trillion (± USD 558 million) in the 2025/26 financial year, surpassing the annual target of TZS 1.2 trillion by 16.13% and marking a 30.2% increase over the TZS 1.071 trillion collected in 2024/25. The result caps a period of rapid growth for the sector, whose GDP contribution averaged 11.9% in 2025 and whose mineral exports rose 31.1% to USD 5.4 billion.