Tanzanian Railway Receiving USD 300 Million Funding From WB

A few weeks after the President Kikwete had asked for Tanzanian railway funding, the World Bank (WB) had approved USD 300 Million (TZS 480 billion) loan aimed at the improvement of railway infrastructure on the Dar es Salaam-Isaka section of the East African Central Corridor.

The improvement is supposed to consist of the rehabilitation of 28 bridges, repairing tracks to heavier crane rail, strengthening metre gauge, and building new intermodal terminals.

Tanzanian Railway Corporation will be responsible for implementing the project and is expecting to double transport capacity from 1.4 million tons to 3 million tons annually.

According to the World Bank Country Director for Tanzania Philippe Dongier: “The location and the size of Tanzania, its mineral and agricultural resources, its tourism potential and its critical role as a transport hub for its landlocked neighbors provide unrivalled opportunities for the development of modern transport infrastructures and services.”

The Central Corridor Railway was built in 1906, with the Dar es Salaam-Isaka section connecting Tanzania with Rwanda and Burundi.

Related Posts
Tanzania Transport Minister Mbarawa 100 days Update
Read More

Ministry of Transport Updates First 100 Days of Sixth Phase Government Second Term: Achievements Include TAZARA Rehabilitation Deal, 838,000 Rail Passengers and New Infrastructure

Tanzania’s Ministry of Transport outlined achievements recorded during the first 100 days of the government’s second term, including transport of more than 838,000 rail passengers and over 85,000 tonnes of cargo. The update also confirms the signing of the Tanzania-Zambia Railway (TAZARA) rehabilitation agreement set to start in June 2026, and the launch of a vessel with capacity for 1,200 passengers and 400 tonnes of cargo.