Tanzania Energy Sector Local Content Policy In Final Stage

The Tanzanian Ministry of Energy and Minerals (MEM) has announced this month that the Local Content Policy (LCP), developed to ensure that energy resources will be explored in a diversified and sustainable manner to enhance energy sector and create employment, is in its final stage and about to be completed.

The announcement was made by Ms. Neema Jugangira Aspon, MEM’s Responsible for Local Content during the “Seminar on the awareness and opportunities available in the Oil & Gas Supply Chain for Small and Medium Enterprises (SMEs) in Tanzania”, organized by the Tanzania Private Sector Foundation (TPSF) and Tanzania Investment Centre (TIC) in the Country’s commercial capital Dar es Salaam.

The last revision of the LCP in Oil and Gas was passed by the MEM’s current cabinet two months ago and is in the final stages to be completed, explained Ms. Lugangira during her speech.

Tanzania Investment Guide 2026 Free Edition

The new LCP will be the result of combining four assed policies into one that includes the LCP and the current National Energy Policy (NEP).

According to the MEM’s website, Tanzania’s Energy Sector currently counts with 8 different regulatory documents between policies and acts: NEP 2015, LCP 2015, Petroleum Policy 2014, Petroleum Act 2008, Electricity Act 2008, Petroleum Policy 2014, Environmental Impact Assessment (EIA) 2012, and the Natural Gas Policy 2013.

The new LCP’s main objective is to help the SMEs in the country with more affordable information to promote the sector’s development.

Want to know more about Energy in Tanzania? Our free overview of the Tanzania Business and Investment Guide 2026 covers Energy, plus key sectors and investment opportunities. The complete 141-page edition includes policies, taxation, key regulations, full macroeconomic data, and sources, and is also available at no cost upon completion of a short form.

Download Free OverviewGet the Full Edition for Free
Related Posts
Tanzania Julius Nyerere Hydropower Project (JNHPP)
Read More

Tanzania Electricity Surplus Hits 2,375 MW As Julius Nyerere Hydropower Project Is Officially Launched

The Julius Nyerere Hydropower Project's 2,115MW plant lifted Tanzania's installed generation capacity to 4,646MW against peak demand of 2,271MW, with a surplus of 2,375MW, after President Samia Suluhu Hassan's inauguration on 22 August 2026. The government has signed an agreement to export power to Zambia and reached a trading arrangement with Kenya, while a newly completed 400kV Chalinze-Dodoma transmission line lifted national peak demand by 150MW within three days of coming online.
Presidents Samia Suluhu Hassan and Yoweri Museveni witness the Tanga Regional Energy Hub MoU signing, State House Dar es Salaam
Read More

Tanzania, Uganda Sign MoU for USD 20 Billion Tanga Energy Hub

Tanzania and Uganda signed a Memorandum of Understanding at State House on 6 August 2026 to develop Tanga as a Regional Energy Hub, a deal Tanzania's Energy Minister said could attract investment exceeding USD 20 billion. The agreement, signed by the Uganda National Oil Company, the Tanzania Petroleum Development Corporation, and Vitol Bahrain E.C., covers petroleum storage, refining, logistics, and distribution infrastructure at the port of Tanga, building on the East African Crude Oil Pipeline.
Samia Suluhu Hassan Africa50 Forum Dar es Salaam 2026
Read More

Tanzania President Calls for Faster Infrastructure Delivery Via PPPs as Country Signs Five Agreements on Power Transmission, Gas and Health

Tanzania President Samia Suluhu Hassan called for faster infrastructure delivery through public-private partnerships (PPPs) as Tanzania signed five agreements at Africa50's Infra for Africa Forum, covering an electricity transmission PPP with TANESCO, natural gas supply to local industry with TPDC and TAQA Arabia, and expanded kidney dialysis care. Africa50 secured USD 70 million in new capital from British International Investment, the Italian Climate Fund and Proparco, the private sector financing arm of the French Development Agency group (AFD).
Tanzania Mini Small-Scale LNG Project
Read More

Tanzania Signs Agreements for First Small-Scale LNG Project To Extend Natural Gas Access to Arusha, Dodoma, Mwanza, and Zanzibar

The Tanzania Petroleum Development Corporation (TPDC), TAQA Arabia subsidiary Rosetta Energy Solutions, and Africa50 have signed agreements for a USD 100 million small-scale LNG project, targeting commercial operations by 2027. The project will extend gas distribution to Arusha, Dodoma, Mwanza, and Zanzibar, areas currently outside Tanzania's pipeline network, with TPDC seeking a stake exceeding 30% in the venture.