Tanzania, Zambia, and China to Revitalize the TAZARA Railway With $ 1 Billion

Tanzania, Zambia, and China to Revitalize the 1,860 km TAZARA Railway

On 4th September 2024, Tanzania, Zambia, and China signed a Memorandum of Understanding (MoU) for the revitalization of the Tanzania-Zambia Railway (TAZARA).

The signing took place on 4th September during the 2024 Forum on China-Africa Cooperation (FOCAC), held in Beijing, China.

The signatories of the agreement were Zambia’s Minister of Transport and Logistics Hon. Museba Frank Tayali, his Tanzania counterpart, the Minister of Works and Transport Hon. Prof. Makame Mbarawa, the Chairman of the China Railway Construction Corporation (CRCC) Dai Hegen, and TAZARA’s Managing Director Bruno Ching’andu.

Tanzania Investment Guide 2026 Free Edition

Tanzania’s President Samia Suluhu Hassan, China’s President Xi Jinping, and Zambia’s President Hakainde Hichilema witnessed the signing of the memorandum.

The agreement follows China’s proposal in February 2024 to invest USD 1 billion to revitalize the railway.


Speaking during the Forum, President Xi said “China is willing to take this summit as an opportunity to make new progress in the revitalization of the Tanzania-Zambia railway, cooperate to improve the rail-sea intermodal transport network in East Africa, and build Tanzania into a demonstration zone for deepening high-quality China-Africa Belt and Road cooperation.”

TAZARA’s Railway Connection

TAZARA is a bi-national railway linking Zambia to Tanzania and the Dar es Salaam seaport. Financed by China, it was built from 1970 to 1975 and began commercial operations in 1976.

The 1,860-kilometer single-track railway provides a route for bulk trade from Zambia’s Copper belt to the Indian Ocean.

TanzaniaInvest Capital Markets Report Banner

Despite its capacity to transport five million metric tons of cargo annually, TAZARA has been operating below potential, with recent figures indicating a cargo movement of 244,492 tons in the 2021/23 period.

TAZARA’s target for the 2024/25 financial year is set at 350,000 tons and 3,430,000 passengers with a projected total income of USD 55.19 million anticipated from various sources like freight, parcels, passengers, and other non-operational activities.

The revitalization of TAZARA is expected to boost its cargo and passenger transport abilities.

Want to know more about Transport in Tanzania? Our free overview of the Tanzania Business and Investment Guide 2026 covers Transport, plus key sectors and investment opportunities. The complete 141-page edition includes policies, taxation, key regulations, full macroeconomic data, and sources, and is also available at no cost upon completion of a short form.

Download Free OverviewGet the Full Edition for Free
Related Posts
Samia Suluhu Hassan Ndiame Diop World Bank Dar es Salaam Port Second Phase
Read More

World Bank Considers Financing Second Phase of Dar es Salaam Port Upgrade

The World Bank is considering financing a second phase of the Dar es Salaam Port upgrade after the first phase, backed by a USD 345 million credit, reached 85% completion and helped raise annual throughput from 14 million tonnes in 2015/16 to 32.8 million tonnes in 2025/26. Regional Vice President Ndiamé Diop signalled the interest during a three-day visit that included talks with President Samia Suluhu Hassan on 20 August 2026 covering the SGR, central corridor development, agriculture, education and the mobilisation of private investment.
Tanzania Samia Suluhu Hassan DRC Felix Tshisekedi
Read More

DRC to Build Dry Port in Dar es Salaam, Deepen Transport and Mining Ties with Tanzania

The Democratic Republic of the Congo (DRC) has begun preparations to build a dry port in Dar es Salaam that will provide customs, cargo handling, mineral certification, and quality control services for Congolese goods moving through Tanzania, President Félix Tshisekedi announced during a state visit to Tanzania on 18 August 2026. The DRC is among the largest users of Tanzanian ports, with approximately 7.2 million tonnes of cargo handled in 2023, as the two countries agreed to accelerate transport, trade, and mining cooperation along the Central Corridor.
Tanzania President Samia Suluhu Hassan foundation stone construction Tabora-Kigoma Standard Gauge Railway (SGR)
Read More

Tanzania Begins Construction of USD 2.74 Billion Tabora-Kigoma SGR Railway Section

President Samia Suluhu Hassan laid the foundation stone for the 506-kilometer Tabora-Kigoma Standard Gauge Railway (SGR) section on 20 July 2026, a USD 2.74 billion (TZS 7.4 trillion) investment linking Dar es Salaam Port to Lake Tanganyika. The section forms the second phase of Tanzania's SGR program, alongside the planned Uvinza-Musongati line, and is expected to position Kigoma as a regional trade hub connecting Tanzania to Burundi, the Democratic Republic of Congo and Zambia.