Construction of Mgao Island Cargo Port in Mtwara Reaches 25% as Government Invests TZS 435B

Construction of the Mgao Island cargo port in Mtwara has reached 25%, according to the Tanzania Ports Authority. The TZS 435B project is scheduled for completion in July 2028 and is designed to handle hazardous and bulk cargo.
Tanzania Mgao Island cargo port construction update

The Government of Tanzania is implementing the Mgao Island Port Construction Project in Mtwara Region at TZS 435B to build a dedicated cargo port for handling hazardous and bulk goods.

The project aims to improve the transportation and handling of cargoes such as coal, cement, chemicals, and fertilizers that were previously handled at Mtwara Port.

The new port is being developed on Mgao Island and is intended to separate hazardous and so-called dirty cargo from the main port to improve safety and operational efficiency.

Tanzania Investment Guide 2026 Free Edition

The Minister of Transport, Prof. Makame Mbarawa, stated this on December 19, 2025, during an inspection visit to the project.

He said the port has been specially designed to transport and receive hazardous goods that were previously served by Mtwara Port.

Prof. Mbarawa also directed that construction of the port should go hand in hand with the development of a 17 km four-lane road to address the expected increase in traffic generated by the project.

He assured President Dr. Samia Suluhu Hassan that the Ministry of Transport and the Tanzania Ports Authority (TPA) will implement the project to high standards and ensure value for money as part of the government’s economic growth agenda.

TPA Director General Plasduce Mbossa said the project has reached 25% of implementation.

TanzaniaInvest Capital Markets Report Banner

He said the port will increase the capacity of Mtwara Port to handle large and strategic cargoes and strengthen Tanzania’s regional competitiveness.

Mtwara District Commissioner Abdallah Mwaipaya said local authorities have welcomed the project.

He said completion of the port together with the four-lane road will bring major changes to port activities and support economic development for residents of Mtwara Region.

The Mgao Island Port Construction Project is being implemented by China Harbour Engineering Company Limited. The project is expected to be completed in July 2028.

Mtwara Region and Port Infrastructure

Mtwara Region is located in southern Tanzania and serves as a key economic zone for the country’s Southern Corridor.

The region hosts major economic activities including natural gas production, cement manufacturing, agriculture, and cross-border trade with Mozambique.

Mtwara Port is one of Tanzania’s main seaports and supports the movement of bulk, industrial, and general cargo for southern Tanzania and neighboring countries.

The port has historically handled coal, cement, fertilizers, and other bulk and hazardous cargo linked to industrial and extractive activities in the region.

Rising industrial output and cargo volumes have increased pressure on existing port infrastructure and operations.

Want to know more about Transport in Tanzania? Our free overview of the Tanzania Business and Investment Guide 2026 covers Transport, plus key sectors and investment opportunities. The complete 141-page edition includes policies, taxation, key regulations, full macroeconomic data, and sources, and is also available at no cost upon completion of a short form.

Download Free OverviewGet the Full Edition for Free
Related Posts
Samia Suluhu Hassan Ndiame Diop World Bank Dar es Salaam Port Second Phase
Read More

World Bank Considers Financing Second Phase of Dar es Salaam Port Upgrade

The World Bank is considering financing a second phase of the Dar es Salaam Port upgrade after the first phase, backed by a USD 345 million credit, reached 85% completion and helped raise annual throughput from 14 million tonnes in 2015/16 to 32.8 million tonnes in 2025/26. Regional Vice President Ndiamé Diop signalled the interest during a three-day visit that included talks with President Samia Suluhu Hassan on 20 August 2026 covering the SGR, central corridor development, agriculture, education and the mobilisation of private investment.
Tanzania Samia Suluhu Hassan DRC Felix Tshisekedi
Read More

DRC to Build Dry Port in Dar es Salaam, Deepen Transport and Mining Ties with Tanzania

The Democratic Republic of the Congo (DRC) has begun preparations to build a dry port in Dar es Salaam that will provide customs, cargo handling, mineral certification, and quality control services for Congolese goods moving through Tanzania, President Félix Tshisekedi announced during a state visit to Tanzania on 18 August 2026. The DRC is among the largest users of Tanzanian ports, with approximately 7.2 million tonnes of cargo handled in 2023, as the two countries agreed to accelerate transport, trade, and mining cooperation along the Central Corridor.
Tanzania President Samia Suluhu Hassan foundation stone construction Tabora-Kigoma Standard Gauge Railway (SGR)
Read More

Tanzania Begins Construction of USD 2.74 Billion Tabora-Kigoma SGR Railway Section

President Samia Suluhu Hassan laid the foundation stone for the 506-kilometer Tabora-Kigoma Standard Gauge Railway (SGR) section on 20 July 2026, a USD 2.74 billion (TZS 7.4 trillion) investment linking Dar es Salaam Port to Lake Tanganyika. The section forms the second phase of Tanzania's SGR program, alongside the planned Uvinza-Musongati line, and is expected to position Kigoma as a regional trade hub connecting Tanzania to Burundi, the Democratic Republic of Congo and Zambia.