Tanzania Begins Compensation for Engaruka Soda Ash Project

Tanzania has started compensating residents for the Engaruka Soda Ash Project, allocating TZS 14.48B. The project, led by NDC, aims to establish two factories producing 1M metric tonnes of soda ash annually, reducing imports and driving industrial growth. Environmental approvals have been secured.
Tanzania soda ash

On January 24, 2025, Tanzania’s Minister of Industry and Trade, Dr. Seleman Jafo, announced the commencement of compensation payments for residents affected by the Engaruka Soda Ash Project in Monduli District, Arusha Region.

The government has allocated TZS 14.48 billion to compensate 519 residents whose land will be utilized for the project.

As of the announcement date, 50 individuals had received payments, with the process expected to be completed by February 15, 2025.

The Engaruka Soda Ash Project is a strategic initiative aimed at establishing two major soda ash factories to harness Tanzania’s natural soda ash reserves.

Led by the National Development Corporation (NDC), the project is valued at US$400 million and is expected to produce at least 1,000,000 metric tonnes of soda ash per year.

The initiative seeks to reduce Tanzania’s reliance on soda ash imports, stimulate related industries such as glass manufacturing, detergents, and water treatment, and enhance the country’s industrialization efforts.

The project is accompanied by infrastructure development, including:

  • A 54-kilometer road to facilitate transportation of raw materials and machinery.
  • A dedicated water supply project to ensure adequate resources for both industrial use and local communities.
  • A 33 KV power supply system to support industrial operations and improve essential services such as education and healthcare.

Speaking at the compensation announcement, Dr. Jafo emphasized:“This project is crucial for Tanzania’s industrialization. We are ensuring that all affected residents receive fair compensation so they can transition smoothly while benefiting from new employment and economic opportunities.”

About the Engaruka Basin and Lake Natron Soda Ash Projectes

The Engaruka Basin was identified as a sustainable location for soda ash extraction after a previous project near Lake Natron was shelved in 2008 due to environmental concerns.

The National Environment Management Council (NEMC) has since granted environmental clearance, ensuring that the project does not negatively impact local ecosystems, including the habitat of flamingos in the area.

This project will involve the extraction of sodium carbonate solution (brine) from underground aquifers to produce soda ash, a crucial raw material used in various industries, including glass manufacturing, fertilizers, dyes, petroleum refining, and water treatment.

The National Development Corporation (NDC) is spearheading this initiative, which promises to provide significant economic benefits to the region, including job creation and local industry support.

In May 2024, NDC has invited investors for the project, with 22 companies expressing interest in participating in its implementation.

On January 10, 2025, the Minister of Industry and Trade, Dr. Seleman Jafo, explained that the project was initially stalled due to environmental concerns at Lake Natron.

However, he stated that the government had conducted additional studies and sought expert advice, which confirmed that the upper plateau of the lake, covering four villages, is a suitable location for soda ash extraction due to its abundant reserves.

Want to know more about Industry in Tanzania? Our free Tanzania Business and Investment Guide 2026 covers Industry, plus regulations, key sectors, and investment opportunities—all in one place.

Download Free Guide
Related Posts
Tanzania steel plant Dodoma
Read More

TZS 600 Billion Steel Plant Using Local Iron Ore to Be Developed in Dodoma, Work Starts in July 2026

A1 Iron & Steel Tanzania Ltd plans to invest TZS 600 billion in a new steel manufacturing plant in Nala, Dodoma. The project will use iron ore as its main raw material, and support Tanzania's strategy to increase mineral value addition and reduce dependence on imported steel products. Construction is scheduled to begin in July 2026 and is expected to be completed within 15 months.
Tanzania Anthony Mavunde Kitila Mkumbo Small-Scale Miners Recommendations Report
Read More

Tanzania Plans Mining Fund and Credit Guarantees to Support Small-Scale Miners

The Government of Tanzania has received recommendations aimed at strengthening the small-scale mining sector through improved access to finance, technology, and geological information. The proposals include establishing a mining fund, expanding credit guarantees, and supporting mineral research to increase employment, reduce poverty, and boost economic growth.
Kabanga Nickel Deposit
Read More

USD 942M Kabanga Nickel Project Moves Closer to Implementation, FID Expected in 2026

The Kabanga Nickel Project has moved closer to implementation after Lifezone Metals (NYSE: LZM) Executive Chairman Keith Liddell and Treasury Registrar Nehemiah Mchechu briefed President Samia Suluhu Hassan on 8 June 2026, with both sides confirming an agreed project structure and turning to finalise the refinery and beneficiation component. The USD 942 million project is targeting a final investment decision in 2026 and is expected to generate USD 2.4 billion in corporate income taxes and around 1,090 jobs.
Lindi Jumbo and Tanzanian government sign graphite joint venture in Ruangwa, Lindi
Read More

Tanzania Government Secures 16% Stake in Lindi Jumbo Graphite Mine Through Ndovu Graphite Joint Venture

The Tanzanian government has formalized its statutory 16% non-dilutable equity stake in the Lindi Jumbo graphite mine in Lindi Region through a joint venture agreement that creates Ndovu Graphite Limited, with Lindi Jumbo Limited retaining an 84% stake. The mine produces 40,000 tonnes of graphite per year over a 24-year mine life, and Tanzania currently ranks sixth globally in graphite production, with an annual output of 25,000 tonnes from two large-scale operating mines, Lindi Jumbo and God Mwanga, in Tanga.