Tanzania Mining Company Surpasses 2014 Gold Production After Strong Q4-2015

Tanzania-stamigold-production-2016

Gold mining business Acacia Mining Plc (LSE:ACA, DSE:ACA) has recently released its Q4-2015 results reporting a strong gold production that has led the company to beat last year’s output despite a gold production 20% below the target during the Q3-2015.

Acacia reported a production growth of 10.85% from 181,084 ounces during the Q4-2014 to 200,723 ounces during the Q4-2015, which helped the company to beat the full year production by 2% from 718,651 ounces in 2014 to 731,912 ounces in 2015 while keeping its all-in sustaining costs (AISC) at USD 1,112 per ounce both years.

All three company’s assets Bulyanhulu, North Mara and Buzwagi performed well during the Q4-2015 even though a labour restructuration that cut 1,050 jobs or 27% of Acacia’s workforce was undertook in 2015 as a cost-cutting effort due to gold spot prices at five year low same year, explained Acacia CEO Bradley Gordon.

The good performance was driven by increased throughput and recoveries from Bulyanhulu and improved grades of gold and recoveries from North Mara.

Bulyanhulu reached a total gold production of 78,223 ounces including 11,349 ounces from reprocessed tailings that yielded to an output 18% ahead of Q4-2014.

North Mara reached a total gold production of 77,304 ounces which was 9% higher than in Q4-2014 and at a 9% higher head grade from 7.9 grams of gold per tonne in Q4-2014 to 8.7 grams per tonne in Q4-2015.

At Buzwagi, gold production reached the 45,195 ounces which was slightly higher than output recorded in Q4-2014 but that registered improvements in throughput and recovery rates per ounce.

In addition, Acacia’s total gold production during the Q4-2015 was achieved at a fewer rate of tonnes mined of 10.1 million compared to 10.8 million in Q4-2014 due to a better equipment availability that yielded to 2.8 million ore tonnes mined 24% ahead of Q4-2014.

Acacia sold in 2015 721,203 ounces of gold which were up by 2% from 703,680 ounces of gold in 2014 and represented total sales of USD 832.3 million in 2015 accounting for approximately 53% of Tanzania’s total gold exports.

Tanzania currently ranks 15th in the world and 3rd in Africa in terms of gold production with a total of 50.8 tonnes -1,791,917 ounces- last year behind South Africa with 167.9 tonnes and Ghana with 104.1 tonnes in the same period according to the world gold council.

The country has an estimated of 45 million ounces of gold reserves and the sector is expected to grow at a rate of 7.7% per annum in the short term according to the Tanzania Chamber of Minerals and Energy (TCME).

Want to know more about Mining in Tanzania? Our free Tanzania Business and Investment Guide 2026 covers Mining, plus regulations, key sectors, and investment opportunities—all in one place.

Download Free Guide
Related Posts
Kabanga Nickel Deposit
Read More

USD 942M Kabanga Nickel Project Moves Closer to Implementation, FID Expected in 2026

The Kabanga Nickel Project has moved closer to implementation after Lifezone Metals (NYSE: LZM) Executive Chairman Keith Liddell and Treasury Registrar Nehemiah Mchechu briefed President Samia Suluhu Hassan on 8 June 2026, with both sides confirming an agreed project structure and turning to finalise the refinery and beneficiation component. The USD 942 million project is targeting a final investment decision in 2026 and is expected to generate USD 2.4 billion in corporate income taxes and around 1,090 jobs.
Lindi Jumbo and Tanzanian government sign graphite joint venture in Ruangwa, Lindi
Read More

Tanzania Government Secures 16% Stake in Lindi Jumbo Graphite Mine Through Ndovu Graphite Joint Venture

The Tanzanian government has formalized its statutory 16% non-dilutable equity stake in the Lindi Jumbo graphite mine in Lindi Region through a joint venture agreement that creates Ndovu Graphite Limited, with Lindi Jumbo Limited retaining an 84% stake. The mine produces 40,000 tonnes of graphite per year over a 24-year mine life, and Tanzania currently ranks sixth globally in graphite production, with an annual output of 25,000 tonnes from two large-scale operating mines, Lindi Jumbo and God Mwanga, in Tanga.
Tanzania Helium One Agreements Signing Southern Rukwa Project
Read More

Tanzania Finalises Agreements for First Helium Mining Licence, Clearing Southern Rukwa Project for Development

Helium One Global (AIM: HE1) and the government of Tanzania have executed the Framework Agreement and Shareholders' Agreement supporting Tanzania's first-ever helium mining licence, activating the 480 km² Southern Rukwa Project under joint venture Songwe Helium Ltd, in which Helium One holds an 83% interest. The company has also appointed PVE Consulting to lead the farm-out process for the project, which flowed 5.5% helium to surface during its 2024 extended well test.