Tanzania’s Mahenge Graphite Project Gets AUD 10 Million for Preparations

Mahenge graphite project Tanzania

Australian graphite developer Black Rock Mining Limited (ASX:BKT) recently announced the successful completion of an AUD 10.0 million placement to institutional and sophisticated investors for critical final preparations related to the Mahenge Graphite Project in Tanzania.

The Placement, priced at AUD 0.065 per share, received firm commitments from both new and existing investors, reflecting robust support for the venture. Approximately 154 million shares will be issued under the Placement, with the issuance expected around April 4, 2024. The issue price of AUD 0.065 per share represents a 20.7% discount to the closing price of BKT shares on March 22, 2024, and a 17.8% discount to the 10-day volume-weighted average price (VWAP).

These preparations, ahead of the Final Investment Decision (FID), encompass various essential activities such as loan and contract documentation, detailed design, equipment specification, and general corporate purposes.

The Placement was facilitated by Petra Capital, acting as the Sole Lead Manager and Sole Bookrunner to the Offer.

Black Rock’s CEO, John de Vries, expressed satisfaction with the level of support from existing shareholders and welcomed several new institutional investors. He emphasized the significance of the Placement in achieving key de-risking milestones and ensuring adequate cash reserves for upcoming operational phases. Additionally, de Vries highlighted the strategic intent to sell a stake in the project, aiming for a premium, as a less dilutive pathway to cash flow.

The Mahenge Graphite Project

Black Rock Mining holds an 84% interest in the project, while the Government of Tanzania has a 16% Free Carried Interest shareholding.

The project hosts a multi-generational graphite resource and is one of the largest JORC-compliant flake graphite resources globally, with 213 million tonnes @ 7.8% TGC and a reserve of 70 million tonnes @ 8.5% TGC.

The Mahenge Project is spread across 324 square kilometers of exploration tenements in Tanzania’s Ulanga district, approximately 250 km north of the border with Mozambique, 250 km west of the coastal port city of Mtwara on the Indian Ocean, and 300 km southwest of Tanzania’s largest city, Dar es Salaam.

Black Rock’s Definitive Feasibility Study for the project considers a four-stage construction schedule to deliver up to 340,000 tonnes per annum of 98.5% graphite concentrate for 26 years of 98.5% LOI premium graphite flake concentrate with the ability to produce Ultra Purity flake of 99% LOI.

Want to know more about Mining in Tanzania? Our free Tanzania Business and Investment Guide 2026 covers Mining, plus regulations, key sectors, and investment opportunities—all in one place.

Download Free Guide
Related Posts
Tanzania steel plant Dodoma
Read More

TZS 600 Billion Steel Plant Using Local Iron Ore to Be Developed in Dodoma, Work Starts in July 2026

A1 Iron & Steel Tanzania Ltd plans to invest TZS 600 billion in a new steel manufacturing plant in Nala, Dodoma. The project will use iron ore as its main raw material, and support Tanzania's strategy to increase mineral value addition and reduce dependence on imported steel products. Construction is scheduled to begin in July 2026 and is expected to be completed within 15 months.
Tanzania Anthony Mavunde Kitila Mkumbo Small-Scale Miners Recommendations Report
Read More

Tanzania Plans Mining Fund and Credit Guarantees to Support Small-Scale Miners

The Government of Tanzania has received recommendations aimed at strengthening the small-scale mining sector through improved access to finance, technology, and geological information. The proposals include establishing a mining fund, expanding credit guarantees, and supporting mineral research to increase employment, reduce poverty, and boost economic growth.
Kabanga Nickel Deposit
Read More

USD 942M Kabanga Nickel Project Moves Closer to Implementation, FID Expected in 2026

The Kabanga Nickel Project has moved closer to implementation after Lifezone Metals (NYSE: LZM) Executive Chairman Keith Liddell and Treasury Registrar Nehemiah Mchechu briefed President Samia Suluhu Hassan on 8 June 2026, with both sides confirming an agreed project structure and turning to finalise the refinery and beneficiation component. The USD 942 million project is targeting a final investment decision in 2026 and is expected to generate USD 2.4 billion in corporate income taxes and around 1,090 jobs.
Lindi Jumbo and Tanzanian government sign graphite joint venture in Ruangwa, Lindi
Read More

Tanzania Government Secures 16% Stake in Lindi Jumbo Graphite Mine Through Ndovu Graphite Joint Venture

The Tanzanian government has formalized its statutory 16% non-dilutable equity stake in the Lindi Jumbo graphite mine in Lindi Region through a joint venture agreement that creates Ndovu Graphite Limited, with Lindi Jumbo Limited retaining an 84% stake. The mine produces 40,000 tonnes of graphite per year over a 24-year mine life, and Tanzania currently ranks sixth globally in graphite production, with an annual output of 25,000 tonnes from two large-scale operating mines, Lindi Jumbo and God Mwanga, in Tanga.