Dangote Pledges 650,000 Barrels per Day Oil Refinery in Tanga, Tanzania, Linked to EACOP

Aliko Dangote has committed to building a 650,000 barrels per day oil refinery at the Port of Tanga, Tanzania, modelled on his USD 20 billion Lagos plant and to be delivered within four to five years, subject to government agreement. The Tanzania oil refinery would process crude from the DRC, Kenya, South Sudan, and Uganda, supported by a new pipeline linking Mombasa to Tanga and connecting to the East African Crude Oil Pipeline (EACOP).
Dangote Tanzania Oil Refinery Pledge

Nigerian industrialist Aliko Dangote has pledged to lead the construction of a 650,000 barrels per day oil refinery in Tanga, Tanzania, in a project modelled on his USD 20 billion Lagos refinery and intended to serve the wider East African market.

The commitment was made at the inaugural Africa We Build Summit 2026, hosted by the Africa Finance Corporation (AFC) in Nairobi on 23–24 April 2026.

Dangote made the pledge during a panel session attended by Kenyan President William Ruto and Ugandan President Yoweri Museveni, conditional on political and policy support from the participating governments.

Tanzania Investment Guide 2026 Free Edition

The proposed facility would be located at the Port of Tanga, in northeastern Tanzania, and would replicate the design and operational standards of the Dangote Petroleum Refinery in Nigeria, which has a processing capacity of 650,000 barrels per day.

According to the plan outlined at the summit, the Tanga refinery would process crude oil sourced from the Democratic Republic of Congo (DRC), Kenya, South Sudan, and Uganda.

The project would be supported by a new pipeline linking the Kenyan port of Mombasa to Tanga, and connecting to the East African Crude Oil Pipeline (EACOP), the 1,443-kilometre pipeline from Uganda’s oil fields to the Tanzanian coast.

Dangote indicated a delivery timeline of four to five years from the moment the participating governments reach a binding agreement.

The investment forms part of Dangote’s broader USD 40 billion expansion strategy, which also includes plans to establish around 20 fertiliser blending plants across Africa by 2028 and to scale up polypropylene production.

Tanzania Investment Guide 2026 Full Edition

Speaking at the panel, Aliko Dangote said: “I can give commitment to the two presidents that are here: if they will support the refinery, we’ll build the identical one that we have in Nigeria—650,000 barrels.”

He added: “My commitment is, if we agree here, with the three or four governments, we will lead and make sure that the refinery is built within the next four to five years.”

President William Ruto confirmed that East African states are coordinating to refine oil within the region rather than exporting crude for processing abroad, stating: “We have made the decision that we are going to do this together. We are going to harness the synergies of Kenya, Uganda, Tanzania, and South Sudan, possibly working together, so that we can have one big refinery here.”

President Yoweri Museveni confirmed that Uganda would supply crude to the proposed Tanga facility and indicated that the EACOP could also serve crude flows from the DRC and South Sudan.

East African Refining Capacity and Fuel Import Dependence

East African economies are currently net importers of refined petroleum products, with some countries in East and Southern Africa sourcing up to three-quarters of their fuel from Gulf-based suppliers, including Saudi Aramco, Abu Dhabi National Oil Company, and Emirates National Oil Company.

The AFC State of Africa’s Infrastructure Report 2026, released at the same summit, projects that Africa’s fuel import shortfall will reach 86 million tonnes by 2040, equivalent to almost three Dangote-sized refineries.

The region has experienced years of underinvestment in downstream infrastructure, with the closure of refineries in Mombasa, Lusaka, Durban, and Limbe.

Uganda is currently advancing a separate 60,000 barrels per day refinery at the Kabalega Industrial Park in Hoima District, with a final investment decision scheduled for July 2026.
Mozambique is also exploring a 200,000 barrels per day refinery backed by Nigerian investor Benedict Peters.

The Dangote Petroleum Refinery in Lagos, which came on stream in 2024, recently reached full capacity and helped Nigeria achieve fuel self-sufficiency.

Want to know more about Energy in Tanzania? Our free overview of the Tanzania Business and Investment Guide 2026 covers Energy, plus key sectors and investment opportunities. The complete 141-page edition includes policies, taxation, key regulations, full macroeconomic data, and sources, and is also available at no cost upon completion of a short form.

Download Free OverviewGet the Full Edition for Free
Related Posts
Presidents Samia Suluhu Hassan and Yoweri Museveni witness the Tanga Regional Energy Hub MoU signing, State House Dar es Salaam
Read More

Tanzania, Uganda Sign MoU for USD 20 Billion Tanga Energy Hub

Tanzania and Uganda signed a Memorandum of Understanding at State House on 6 August 2026 to develop Tanga as a Regional Energy Hub, a deal Tanzania's Energy Minister said could attract investment exceeding USD 20 billion. The agreement, signed by the Uganda National Oil Company, the Tanzania Petroleum Development Corporation, and Vitol Bahrain E.C., covers petroleum storage, refining, logistics, and distribution infrastructure at the port of Tanga, building on the East African Crude Oil Pipeline.
Samia Suluhu Hassan Africa50 Forum Dar es Salaam 2026
Read More

Tanzania President Calls for Faster Infrastructure Delivery Via PPPs as Country Signs Five Agreements on Power Transmission, Gas and Health

Tanzania President Samia Suluhu Hassan called for faster infrastructure delivery through public-private partnerships (PPPs) as Tanzania signed five agreements at Africa50's Infra for Africa Forum, covering an electricity transmission PPP with TANESCO, natural gas supply to local industry with TPDC and TAQA Arabia, and expanded kidney dialysis care. Africa50 secured USD 70 million in new capital from British International Investment, the Italian Climate Fund and Proparco, the private sector financing arm of the French Development Agency group (AFD).
Tanzania Contract 100 MW Kishapu Solar Project Phase Two
Read More

Tanzania Signs TZS 204.4 Billion Contract for 100 MW Kishapu Solar Project Phase Two

Tanzania has signed a contract worth approximately TZS 204.4 billion with Sagemcom Energy & Telecom SAS and STEG International Services for the 100 MW second phase of the Kishapu Solar Power Project in Ngunga, Shinyanga Region, taking the full 150 MW project's cost to approximately TZS 323 billion. The contract follows completion of the project's 50 MW first phase, which cost TZS 118.6 billion and became Tanzania's first grid-connected utility-scale solar plant in March 2026.
Eastern Africa Power Pool (EAPP) 2026 Council of Ministers Meeting
Read More

Eastern Africa Power Pool Ministers Agree to Accelerate Regional Electricity Market

Eastern Africa Power Pool (EAPP) member states have agreed to speed up the implementation of a regional electricity market aimed at expanding cross-border electricity trade and strengthening energy security. Tanzania said the initiative will support industrial growth, attract investment, and improve the reliability of electricity supply across the region.