Tanzania’s Liganga and Mchuchuma Iron Ore and Coal Projects Set to Start Within Three Months With US$3 Billion Investment

Tanzania is set to begin the Liganga and Mchuchuma integrated iron ore, coal, and steel projects within three months after investor negotiations passed 90%. The US$2 billion to US$3 billion projects in Njombe aim to produce 2.9 million tons of crude steel annually and create 6,500 formal jobs.
Tanzania Liganga and Mchuchuma Iron Ore and Coal Projects

Tanzania is expected to begin implementing the Liganga and Mchuchuma integrated iron ore, coal, and steel projects within the next three months after negotiations between the government and the investor reached more than 90%, paving the way for the start of one of the country’s largest mining and industrial developments after decades of delays.

The two projects, located in Njombe Region, are expected to attract between US$ 2 billion and US$ 3 billion in investment and will combine iron ore mining at Liganga, coal mining at Mchuchuma, and downstream steel production.

The announcement was made on May 9, 2026, by Gerson Msigwa, who said the government is in the final stages of negotiations with the investor and expects implementation to begin within three months.

He said the projects are expected to produce 2.9 million tons of crude steel per year and 1.1 million tons of steel products annually.

The developments are also projected to create more than 6,500 formal jobs and around 26,000 informal jobs, while supporting local industries linked to mining, manufacturing and infrastructure.

According to Msigwa, the projects are expected to generate a total of US$ 1.9 billion during the first 25 years of operation.

He said projected revenue from the coal project is estimated at US$ 92 million, while iron ore mining is expected to generate US$ 910 million, and steel production US$ 987,114.

The integrated development will also include supporting infrastructure such as a 220kV transmission line between Mchuchuma and Liganga, a road linking the two sites, a coal mine with annual production capacity of 3 million tons and a 600 megawatt power plant.

Msigwa said the government has already paid more than TZS 15 billion in compensation to affected residents to facilitate implementation.

“The move demonstrates the Government’s commitment to ensuring that the project begins in practice after a long wait,” he said.

The projects have been identified among flagship investments under Tanzania’s Development Vision 2050, which aims to support the country’s long-term industrialization and economic expansion.

Liganga and Mchuchuma Projects

The Liganga and Mchuchuma projects are integrated mining and industrial developments in Ludewa District, Njombe Region, designed to exploit Tanzania’s iron ore and coal deposits for domestic steel production.

Liganga contains one of Tanzania’s largest known iron ore deposits, while Mchuchuma hosts large coal reserves intended to supply both the mining operations and the planned steel complex.

The projects are being developed and implemented by Tanzania China International Mineral Resources Limited (TCIMRL), a Joint Venture Company (JVC) between the Government through NDC (20% non-cash) and Sichuan Hongda Group from China (80%).

Implementation stalled for years due to financing constraints, infrastructure requirements, and negotiations over revised investment terms.

Want to know more about Mining in Tanzania? Our free Tanzania Business and Investment Guide 2026 covers Mining, plus regulations, key sectors, and investment opportunities—all in one place.

Download Free Guide
Related Posts
Kabanga Nickel Deposit
Read More

USD 942M Kabanga Nickel Project Moves Closer to Implementation, FID Expected in 2026

The Kabanga Nickel Project has moved closer to implementation after Lifezone Metals (NYSE: LZM) Executive Chairman Keith Liddell and Treasury Registrar Nehemiah Mchechu briefed President Samia Suluhu Hassan on 8 June 2026, with both sides confirming an agreed project structure and turning to finalise the refinery and beneficiation component. The USD 942 million project is targeting a final investment decision in 2026 and is expected to generate USD 2.4 billion in corporate income taxes and around 1,090 jobs.
Lindi Jumbo and Tanzanian government sign graphite joint venture in Ruangwa, Lindi
Read More

Tanzania Government Secures 16% Stake in Lindi Jumbo Graphite Mine Through Ndovu Graphite Joint Venture

The Tanzanian government has formalized its statutory 16% non-dilutable equity stake in the Lindi Jumbo graphite mine in Lindi Region through a joint venture agreement that creates Ndovu Graphite Limited, with Lindi Jumbo Limited retaining an 84% stake. The mine produces 40,000 tonnes of graphite per year over a 24-year mine life, and Tanzania currently ranks sixth globally in graphite production, with an annual output of 25,000 tonnes from two large-scale operating mines, Lindi Jumbo and God Mwanga, in Tanga.
Tanzania Helium One Agreements Signing Southern Rukwa Project
Read More

Tanzania Finalises Agreements for First Helium Mining Licence, Clearing Southern Rukwa Project for Development

Helium One Global (AIM: HE1) and the government of Tanzania have executed the Framework Agreement and Shareholders' Agreement supporting Tanzania's first-ever helium mining licence, activating the 480 km² Southern Rukwa Project under joint venture Songwe Helium Ltd, in which Helium One holds an 83% interest. The company has also appointed PVE Consulting to lead the farm-out process for the project, which flowed 5.5% helium to surface during its 2024 extended well test.
Dodoma Region Investment Guide
Read More

Tanzania Government Calls for Investment in Dodoma Mining, Agriculture, Tourism and Trade

Tanzania's Finance Minister and the Dodoma Regional Commissioner have jointly called on investors to tap into opportunities in Dodoma's mining, agriculture, tourism, and trade, with mining flagged as the region's largest potential through value addition. Specific openings include a proposed dry port to leverage Dodoma's central location at the heart of Tanzania, the construction of five-star hotels and international conference centres, and the development of mineral processing facilities, alongside the rollout of the Tourism Development Strategy for Dodoma Region 2025–2030.