North Rukwa Helium Project Update: High Levels of Gas Saturation Found

Drilling begins at North Rukwa's Helium Project in Tanzania

Noble Helium Limited (ASX: NHE) recently issued an update on the drilling results at Mbelele at the company’s North Rukwa Helium Project in Tanzania.

The data collected from drilling the Mbelele-1 well indicates a 10-15 meter column of free gas within the upper part of the Mbelele structure, consisting of a mixture of helium and nitrogen.

While as previously advised a sample of the gas could not be collected, this interval encountered the highest helium readings in mud gas for the entire drilling program.

The company is now working with Netherland Sewell and Associates Inc (NSAI) to satisfy the requirements under the guidelines of the SPE-PRMS (a standard for consistently defining, classifying, and estimating hydrocarbon resources) for declaration of a conventional helium discovery.

The company considers the free gas as potential material for its early monetization plans and intends to revisit this gas intersection as soon as possible with a small, low-cost rig for sampling and flow testing.

Gas-phase helium was further recovered at the surface from fluid samples taken from deeper reservoirs beneath the free gas column within the Mbelele structure.

As the fluid samples were brought to the surface, they depressurized naturally and gas came out of the solution (‘exsolved’) into free gas, which was then calculated to contain Nitrogen and 2-3% Helium (after correction for air contamination).

This represents the minimum amount of helium contained within the fluid sample. Evidence indicates all of the reported reservoir intersections at Mbelele-1 and Mbelele-2 contain these helium-enriched fluids.

Not only did each reservoir have helium shows in mud gas, but in numerous cases exsolution bubbles with elevated helium were identified in the mud system while drilling, demonstrating high levels of gas saturation.

Combined with their high saturations, helium content and significant thickness, these high-quality and permeable reservoirs represent a new play type in North Rukwa and potentially significant upside, as an unconventional resource within the Mbelele structure.

While waiting on lab results to confirm helium concentrations within the fluid samples, the company is working with the Centre for Natural Gas at the University of Queensland to satisfy the requirements of the SPE-PRMS for an unconventional discovery.

The results to date confirm North Rukwa as a prolific helium-producing province and enhance the prospectivity of the company’s mapped prospects and leads.

The Rukwa Helium Project

Rukwa is a large-scale, high-grade, primary helium project covering an area of approximately 3,590 km2 in southwestern Tanzania with the potential to become a strategic asset in resolving a supply-constrained market.  

The North Rukwa project boasts a potential helium resource of 176 billion cubic feet, making this the largest known primary helium resource in the world, and positioning this Tanzanian region as a potential major source of helium globally.

Helium is indispensable in various applications, from hospital MRI machines to components in electronics and space missions.

Want to know more about Mining in Tanzania? Our free Tanzania Business and Investment Guide 2026 covers Mining, plus regulations, key sectors, and investment opportunities—all in one place.

Download Free Guide
Related Posts
Tanzania steel plant Dodoma
Read More

TZS 600 Billion Steel Plant Using Local Iron Ore to Be Developed in Dodoma, Work Starts in July 2026

A1 Iron & Steel Tanzania Ltd plans to invest TZS 600 billion in a new steel manufacturing plant in Nala, Dodoma. The project will use iron ore as its main raw material, and support Tanzania's strategy to increase mineral value addition and reduce dependence on imported steel products. Construction is scheduled to begin in July 2026 and is expected to be completed within 15 months.
Tanzania Anthony Mavunde Kitila Mkumbo Small-Scale Miners Recommendations Report
Read More

Tanzania Plans Mining Fund and Credit Guarantees to Support Small-Scale Miners

The Government of Tanzania has received recommendations aimed at strengthening the small-scale mining sector through improved access to finance, technology, and geological information. The proposals include establishing a mining fund, expanding credit guarantees, and supporting mineral research to increase employment, reduce poverty, and boost economic growth.
Kabanga Nickel Deposit
Read More

USD 942M Kabanga Nickel Project Moves Closer to Implementation, FID Expected in 2026

The Kabanga Nickel Project has moved closer to implementation after Lifezone Metals (NYSE: LZM) Executive Chairman Keith Liddell and Treasury Registrar Nehemiah Mchechu briefed President Samia Suluhu Hassan on 8 June 2026, with both sides confirming an agreed project structure and turning to finalise the refinery and beneficiation component. The USD 942 million project is targeting a final investment decision in 2026 and is expected to generate USD 2.4 billion in corporate income taxes and around 1,090 jobs.
Lindi Jumbo and Tanzanian government sign graphite joint venture in Ruangwa, Lindi
Read More

Tanzania Government Secures 16% Stake in Lindi Jumbo Graphite Mine Through Ndovu Graphite Joint Venture

The Tanzanian government has formalized its statutory 16% non-dilutable equity stake in the Lindi Jumbo graphite mine in Lindi Region through a joint venture agreement that creates Ndovu Graphite Limited, with Lindi Jumbo Limited retaining an 84% stake. The mine produces 40,000 tonnes of graphite per year over a 24-year mine life, and Tanzania currently ranks sixth globally in graphite production, with an annual output of 25,000 tonnes from two large-scale operating mines, Lindi Jumbo and God Mwanga, in Tanga.