Chinese Corporation in Talks to Operate Tanzania-Zambia Railway Amidst Joint Upgrade Efforts

Tazara Upgrade

China Civil Engineering Construction Corporation (CCECC) has been selected by the Chinese government to enter into concession negotiations for the Tanzania-Zambia Railway Authority (TAZARA).

A communiqué from the Tanzania-Zambia Railway Authority, dated 31st October 2023, has called for a proposal from CCECC, a subsidiary of China Railway Construction Corporation (CRCC), to take over the operation of the railway.

The initiative is part of a concerted effort by Tanzania and Zambia to revitalize the key transport link that connects the landlocked Zambia to the Tanzanian port city of Dar es Salaam.

Tanzania Investment Guide 2026 Free Edition

It follows a Joint Steering Committee of Permanent Secretaries on the revitalization of TAZARA with the involvement of the Government of China, held on 25th August 2023, in Dar es Salaam, chaired by the Permanent Secretary of the Ministry of Works and Transport of the Government of the United Republic of Tanzania, Mr. Gabriel Migire, and co-chaired by the Permanent Secretary of the Ministry of Transport and Logistics of the Government of the Republic of Zambia.

The purpose of the meeting was specifically for the Government of the United Republic of Tanzania and the Government of the Republic of Zambia to discuss and agree on a common position regarding the revitalization of TAZARA, with the involvement of the Government of the People’s Republic of China.

The Steering Committee agreed to request the Government of the People’s Republic of China to submit a comprehensive proposal on their envisioned concession of TAZARA to enable the Governments of Tanzania and Zambia to begin discussions and engage with the Chinese investors expeditiously.

In a recent address to the Zambian Parliament, Tanzanian President Samia Suluhu Hassan called for swift and decisive reforms of TAZARA to maximize its operational capacity and foster increased trade and cooperation between Tanzania and Zambia.

President Samia highlighted the underutilization of the railway, which has the potential to transport five million metric tonnes of cargo annually but last year only managed to carry 210,000 metric tonnes.

TanzaniaInvest Capital Markets Report Banner

She emphasized the need for both countries to work together to harness the full potential of TAZARA and urged the Zambian Parliament to support the necessary legislative changes, including the Tanzania-Zambia Railway Act.

Zambian President Hakainde Hichilema has also underscored the importance of the railway, advocating for its restoration to enhance the movement of goods and petroleum products.

His commitment to the project was evident during the 59th Independence celebrations, where he emphasized the urgent need to restore the TAZARA corridor.

The railway, constructed with Chinese assistance in the 1970s, is set to be upgraded, including a transition to standard gauge, to improve its operational capacity and efficiency.

Despite its design capacity to transport five million metric tonnes of cargo annually, TAZARA has been operating below potential, with recent figures indicating a cargo movement of 244,492 tonnes in the 2021/23 period.

The revitalization of TAZARA is expected to significantly boost its cargo and passenger transport capabilities, which have historically peaked at 564,000 passengers annually against a capacity of three million.

About TAZARA

TAZARA is the entity in charge of operating the Tanzania-Zambia railway since its inception in 1975 by a bilateral agreement signed between both countries under the TAZARA Act 1975.

China funded the project mainly to provide an alternative route from Zambia to Dar es Salaam to export its copper.

China also provided the necessary technical support, expertise, equipment, and related infrastructure to make it viable.

In the 1990s, the economic performance of the railway began to decline and continued deteriorating over the next 20 years. However, after 2010 China has been helping TAZARA to revive its operations.

Still, TAZARA infrastructure cannot currently meet today’s development demand.

Want to know more about Transport in Tanzania? Our free overview of the Tanzania Business and Investment Guide 2026 covers Transport, plus key sectors and investment opportunities. The complete 141-page edition includes policies, taxation, key regulations, full macroeconomic data, and sources, and is also available at no cost upon completion of a short form.

Download Free OverviewGet the Full Edition for Free
Related Posts
Samia Suluhu Hassan Ndiame Diop World Bank Dar es Salaam Port Second Phase
Read More

World Bank Considers Financing Second Phase of Dar es Salaam Port Upgrade

The World Bank is considering financing a second phase of the Dar es Salaam Port upgrade after the first phase, backed by a USD 345 million credit, reached 85% completion and helped raise annual throughput from 14 million tonnes in 2015/16 to 32.8 million tonnes in 2025/26. Regional Vice President Ndiamé Diop signalled the interest during a three-day visit that included talks with President Samia Suluhu Hassan on 20 August 2026 covering the SGR, central corridor development, agriculture, education and the mobilisation of private investment.
Tanzania Samia Suluhu Hassan DRC Felix Tshisekedi
Read More

DRC to Build Dry Port in Dar es Salaam, Deepen Transport and Mining Ties with Tanzania

The Democratic Republic of the Congo (DRC) has begun preparations to build a dry port in Dar es Salaam that will provide customs, cargo handling, mineral certification, and quality control services for Congolese goods moving through Tanzania, President Félix Tshisekedi announced during a state visit to Tanzania on 18 August 2026. The DRC is among the largest users of Tanzanian ports, with approximately 7.2 million tonnes of cargo handled in 2023, as the two countries agreed to accelerate transport, trade, and mining cooperation along the Central Corridor.
Tanzania President Samia Suluhu Hassan foundation stone construction Tabora-Kigoma Standard Gauge Railway (SGR)
Read More

Tanzania Begins Construction of USD 2.74 Billion Tabora-Kigoma SGR Railway Section

President Samia Suluhu Hassan laid the foundation stone for the 506-kilometer Tabora-Kigoma Standard Gauge Railway (SGR) section on 20 July 2026, a USD 2.74 billion (TZS 7.4 trillion) investment linking Dar es Salaam Port to Lake Tanganyika. The section forms the second phase of Tanzania's SGR program, alongside the planned Uvinza-Musongati line, and is expected to position Kigoma as a regional trade hub connecting Tanzania to Burundi, the Democratic Republic of Congo and Zambia.