Tanzania to Assemble First CNG Heavy-Duty Lorry at Bagamoyo SEZ With USD 3B Chinese Investment

Tanzania is set to produce its first CNG-powered heavy-duty lorry by the end of 2026 at the Bagamoyo Eco-Maritime City Special Economic Zone, following a USD 3 billion investment commitment by HWTZ SEZ Limited, a subsidiary of China’s Hongwang Holding Group. The 500-hectare facility will host over 150 industries—including motorcycle production, boat manufacturing, and spare parts—and is projected to create more than 5,000 direct jobs for Tanzanians.
Tanzania Tiseza Gilead Teri China HWTZ David Zhou

Tanzania is set to produce its first compressed natural gas (CNG)-powered heavy-duty lorry by the end of 2026, following the signing of a USD 3 billion land lease agreement between the Tanzania Investment and Special Economic Zones Authority (TISEZA) and HWTZ SEZ Limited, a subsidiary of China’s Hongwang Holding Group.

The agreement covers the development of a large-scale industrial complex at the Bagamoyo Eco-Maritime City (BEMC) Special Economic Zone (SEZ), on a 500-hectare site—equivalent to 5% of the total Bagamoyo SEZ area—under a 33-year land lease.

Three factories are targeted for completion by the end of 2026: 1) a vehicle assembly plant powered by compressed natural gas, 2) a facility for the production of fishing boats and motorcycles, and 3) a factory dedicated to construction materials and metal spare parts.

Tanzania Investment Guide 2026 Free Edition

The use of CNG in vehicle assembly is intended to promote the utilisation of Tanzania’s domestic natural gas resources and reduce dependence on imported fuel.

Infrastructure to be developed within the complex includes roads, water supply, power systems, and solar energy installations.

The project is expected to generate more than 5,000 direct jobs for Tanzanians and facilitate the transfer of modern industrial technology to the country.

Speaking to journalists on April 9, 2026, in Dar es Salaam, TISEZA Director General Gilead Teri emphasised that investment land within the SEZ is leased under the law and not sold, and that lease agreements include specific clauses to ensure investors deliver on their commitments.

Teri also called on Tanzanian investors to take advantage of the opportunity, noting that it is not exclusively open to foreign parties.

Tanzania Investment Guide 2026 Full Edition

He invited local investors—whether individuals or those entering into joint ventures with others—to approach TISEZA for licences to establish industrial facilities within the zone, adding that they would be given priority.

Bagamoyo Eco-Maritime City Special Economic Zone

The BEMC is Tanzania’s flagship industrial and logistics development, designed to transform the Coast Region into a manufacturing and maritime hub for East and Central Africa.

At full capacity, the zone is expected to attract cumulative investments of approximately TZS 8.5 trillion, spanning manufacturing, logistics, marine industries, renewable energy, and technical education.

Six companies were granted investment licences at the BEMC in January 2026, with a combined capital commitment exceeding TZS 180 billion, covering sectors including food packaging, steel manufacturing, engineering, cashew and coffee processing, ferro-alloy production, and vehicle assembly.

TISEZA has allocated 60 additional investment plots at the BEMC for incoming investors.

The zone is also earmarked to host marine industries, including shipbuilding, and is linked to the planned construction of a deep-water port at Bagamoyo, which the government has identified as the future largest port in Tanzania and East Africa.

Want to know more about Industry in Tanzania? Our free overview of the Tanzania Business and Investment Guide 2026 covers Industry, plus key sectors and investment opportunities. The complete 141-page edition includes policies, taxation, key regulations, full macroeconomic data, and sources, and is also available at no cost upon completion of a short form.

Download Free OverviewGet the Full Edition for Free
Related Posts
Tanzania steel plant Dodoma
Read More

TZS 600 Billion Steel Plant Using Local Iron Ore to Be Developed in Dodoma, Work Starts in July 2026

A1 Iron & Steel Tanzania Ltd plans to invest TZS 600 billion in a new steel manufacturing plant in Nala, Dodoma. The project will use iron ore as its main raw material, and support Tanzania's strategy to increase mineral value addition and reduce dependence on imported steel products. Construction is scheduled to begin in July 2026 and is expected to be completed within 15 months.